Frequently Asked Questions

High-pressure piping, steam, compressed air, process heating and cooling, thermal oil, industrial gas lines such as nitrogen and hydrogen, natural gas / CNG / LNG lines, fire protection systems, ventilation and air conditioning systems.

Yes. We are experienced in revising existing installations, increasing capacity and replacing faulty lines without interrupting production. After a site survey, we prepare an application schedule that fits your production plan.

The duration depends on the size of the facility and the type of installation. After the site survey, the scope is defined and a work schedule covering design, material supply and installation is presented.